Location: Montrose rd, Taringa 4068 QLD

We had one of our body corporate clients reach out to us about a failed kerb, due to the lack of steel reinforcement and workmanship from the previous concreter. We were happy to assist with a kerb that is steel reinforced and with a high quality finish.

We used 12mm 500 MPA steel and bondcrete to bond the fresh concrete with the old, bitumen mastic every 3meters of the kerb and sawcuts between the 3meters for expansion. Safe to say their kerb will last a lifetime.

Previous
Previous

Road joint Repair - Kenmore 4069